Completed Projects Year 2024 – 2019
List of Major Project Completed
Item | Contract No. | Description of Contract | Owner | Contract Value (RM) | Date of Award | Date of Completion |
---|---|---|---|---|---|---|
Total | 151,872,000.00 | |||||
1 | TNB
820/2022 | Upgrading OHL 132kV SIHY-SYPS
(Tower Replacing) | TNB | 36,181,000.00 | 20/07/2022 | 28/02/2024 |
2 | TNB 58/2022 | Kerja-kerja SC LILO 275kV OHL Existing
ALSS-TKLG into PMU 275kV MCKIP
(Customer Substation) | TNB | 7,230,000.00 | 14/02/2022 | 10/12/2022 |
3 | TNB
1159/2020 | Reconfiguration of 275kV and 132kV
OHL into PMU 275kV/132kV Elmina West | TNB | 4,650,000.00 | 02/11/2022 | 24/03/2022 |
4 | TNB 1613/2018 | Proposed Double Circuit Lilo 275kV
Transmission Lines from Yong Peng
East – Kampung Awah into Baharu
Substation | TNB | 65,981,000.00 | 03/09/2018 | 02/09/2020 |
5 | TNB 2456/2018 | Reconfiguration of Double Circuit
275kV/132kV PULU-SLKS and 275kV
MCRS-SRDG Transmission Line | TNB | 12,450,000.00 | 07/01/2019 | 05/11/2020 |
6 | SDSB/
SDCLUB
DEV/TNB
A2-2021
/L 148 | Relocation of Existing Tenaga Nasional
Berhad 132kV Overhead Transmission
Line for Proposed Re/Development at
Sri Damansara Club House for M/S Sri
Damansara Sdn Bhd | Land &
General
Berhad | 8,500,000.00 | 07/05/2019 | 14/06/2021 |
7 | TNB
3162/2019 | Dismantle, Design, Supply, Install,
Commission and other related works
for 5 NOS of Tower for Tower T15-2 to
15-6 132kV PAKA-KITH/KITH-RPTS,
Kerteh, Terengganu for Grid
Maintenance (EAST), Grid Division TNB | TNB | 5,000,000.00 | 29/07/2019 | 04/02/2020 |
8 | TNB
3128/2017 | Proposed Upgrading 132kV Double
Circuit Transmission Line from PMU
Kota Setar to PMU Alor Setar with
Single Circuit Loop In/Out into PMU
Mergong | TNB | 11,880,000.00 | 18/01/2017 | 19/07/2019 |
Item | Contract No. | Description of Contract | Owner | Contract Value (RM) | Date of Award | Date of Completion |
---|---|---|---|---|---|---|
Total | 151,872,000.00 | |||||
1 | TNB
820/2022 | Upgrading OHL 132kV SIHY-SYPS (Tower Replacing) | TNB | 36,181,000.00 | 20/07/2022 | 28/02/2024 |
2 | TNB 58/2022 | Kerja-kerja SC LILO 275kV OHL Existing ALSS-TKLG into PMU 275kV MCKIP (Customer Substation) | TNB | 7,230,000.00 | 14/02/2022 | 10/12/2022 |
3 | TNB
1159/2020 | Reconfiguration of 275kV and 132kV OHL into PMU 275kV/ 132kV Elmina West | TNB | 4,650,000.00 | 02/11/2022 | 24/03/2022 |
4 | TNB 1613/2018 | Proposed Double Circuit Lilo 275kV Transmission Lines from Yong Peng East – Kampung Awah into Baharu Substation | TNB | 65,981,000.00 | 03/09/2018 | 02/09/2020 |
5 | TNB 2456/2018 | Reconfiguration of Double Circuit 275kV/132kV PULU-SLKS and 275kV MCRS-SRDG Transmission Line | TNB | 12,450,000.00 | 07/01/2019 | 05/11/2020 |
6 | SDSB/
SDCLUB
DEV/ TNB A2-2021 /L 148 | Relocation of Existing Tenaga Nasional Berhad 132kV Overhead Transmission Line for Proposed Re/ Development at Sri Damansara Club House for M/S Sri Damansara Sdn Bhd | Land & General Berhad | 8,500,000.00 | 07/05/2019 | 14/06/2021 |
7 | TNB
3162/2019 | Dismantle, Design, Supply, Install,
Commission and other related works for 5 NOS of Tower for Tower T15-2 to 15-6 132kV PAKA-KITH/KITH-RPTS, Kerteh, Terengganu for Grid Maintenance (EAST), Grid Division TNB | TNB | 5,000,000.00 | 29/07/2019 | 04/02/2020 |
8 | TNB
3128/2017 | Proposed Upgrading 132kV Double
Circuit Transmission Line from PMU Kota Setar to PMU Alor Setar with Single Circuit Loop In/Out into PMU Mergong | TNB | 11,880,000.00 | 18/01/2017 | 19/07/2019 |
Item | Contract No. | Description of Contract | Owner | Contract Value (RM) | Date of Award | Date of Completion |
---|---|---|---|---|---|---|
Total | 67,660,996.00 | |||||
1 | TNB 2576/2017 | Proposed Termination of
Transmission Lines 230kV Plentong –
Senibong and 275kV Permas Jaya –
Plentong at PMU Plentong | TNB | 1,750,000.00 | 10/10/2017 | 07/03/2018 |
2 | TNB (T)
573/2019 | Proposed 275kV Single Circuit Loop
In/Out Into Alliance Steel Plant –
Interim From Teluk Kalong – Gebeng
Industrial Transmission Line | TNB | 4,600,000.00 | 20/01/2017 | 01/12/2017 |
3 | TNB
251/2015 | Proposed 132Kv Double Circuit
Transmission Lines Looping In/Out
Into 132/33Kv Senai Hi-Tech East
Substation From Existing 132Kv KTBR-SELG/BBTU Transmission Line | TNB | 19,480,370.00 | 22/10/2015 | 29/08/2017 |
4 | TNB (T)
1530/2017 | Reconfiguration Of 275Kv Overhead
Lines at PMU Port Klang Power Station
for Asset Maintenance (Selangor)
asset Maintenance Department,
Transmission TNB | TNB | 1,700,000.00 | 10/04/2017 | 19/06/2017 |
5 | TNB (B)
877/2012
P | Installation, testing & Commission of
33KV Aluminium XLPE single core UG
Cable UG Fibre Optic Cable &
Accessories from PMU Strand Mall
LILO PMU Kota Damansara/PPUM
Dataran Sunway for TNB Distribution | TNB | 1,178,436.00 | 07/11/2013 | 09/06/2016 |
6 | TNB (T)
500/2015 | Upgrading 132Kv Transmission Lines
From PMU Papan To PMU Pengkalan | TNB | 3,360,000.00 | 04/01/2016 | 16/08/2016 |
7 | TNB (T)
557/2014 | Proposed Double Circuit 275Kv
Transmission Line From 275/132Kv
Prai GIS to PMU Kuala Ketil | TNB | 2,485,000.00 | 24/01/2015 | 15/01/2016 |
8 | TNB (T)
566/2014 | Double Circuit Loop In/Out From 132Kv
Overhead Line Skudai -Stulang Into
PMU South Key, Johor Bahru | TNB | 899,888.00 | 08/02/2015 | 29/03/2016 |
9 | TNB (T)
370/2015 | Kerja-kerja Merekabentuk Dan
Membina Menara Penghantaran
275Kv T74 dan T75 Talian Atas dari
PMU Kampung Awah ke PNU Yong
Peng East bagi Jabatan Pengurus
Negeri (Pahang) Jabatan
Senggaraan Aset, Bahagian
Penghantaran, TNB | TNB | 948,195.00 | 01/10/2015 | 21/02/2016 |
10 | TNB (D)
526/2015
(N) | Merekabentuk, Membina dan
Menyiapkan Menara Talian 33Kv No.
KL-B 1 & KL-B 142, Kuala Lipis – Beletik,
Pahang | TNB | 1,360,000.00 | 12/10/2015 | 12/10/2016 |
11 | TNB (T)
567/2014 | Installation of Two(2) 132Kv Lattice
Towers Type T to Replace the
Permanent backstay at existing 132Kv
Overhead Line From Tebrau- Ulu
Tiram, Kota Tinggi, Johor | TNB | 612,890.00 | 11/03/2015 | 02/08/2016 |
12 | TNB (T)
91/2014 | Proposed 132Kv Double Circuit Loop
In/Out Pekan Industry from Pekan Tanjung Batu Transmission Line &
Double Circuit 132Kv Transmission
Line From Kuantan Point A to PMU
Pekan Industry | TNB | 3,462,652.00 | 29/04/2014 | 21/12/2015 |
13 | TNB (T)
555/2014 | Construction of New Transmission
Line Works at PMU 132/33Kv Bukit
Tengah (REHAB STAGE 2) | TNB | 2,125,000.00 | 20/01/2015 | 17/09/2015 |
14 | TNB (T)
474/2014 | Merekabentuk Dan Membina Menara
Penghantaran 132Kv T33 Hingga T42
Talian Atas Tanjong Gelang – Pahang
Cement & Tanjung Gelang –
Semambu Dan 275Kv T32 Hingga T35
Talian Atas Kuantan North- Gebeng
Industri Bagi Pejabat Pengurusan
Negeri (Pahang), Jabatan
Senggaraan Aset, Bahagian
Penghantaran TNB | TNB | 6,322,000.00 | 23/10/2014 | 24/03/2015 |
15 | TNB (T)
454/2012 | 132Kv Transmission Line Single Circuit
Loop In/Out from 132Kv Paka-Rantau
Petronas into Cheil Jedang Switching
Station | TNB | 2,975,879.00 | 01/10/2013 | 27/07/2015 |
16 | TNB (T)
275/2012 | Proposed Double Circuit
Underground Cable from PMU Tasek
Gelugor Switching Station to KTMB
Tasek Gelugor 132kV Feeder Station | TNB | 1,977,480.00 | 12/10/2012 | 19/05/2014 |
17 | TNB (T)
294/2012 | Proposed 132kV Bulk Supply to
Petronas Cogan GPP Complex A (132kV Double Circuit Underground
Cable From Kertih
Industrial Substation to GPP GIS
Substation) | TNB | 2,906,024.00 | 15/10/2012 | 12/08/2013 |
18 | TNB (T)
3/2012 | Proposed 132kV Single Circuit
Underground Cable from PMU
Pandamaran to KTMB Feeder Station
Jalan Kastam, Port Klang | TNB | 3,092,970.00 | 20/02/2012 | 29/08/2013 |
19 | TNB (T)
262/2011 | Proposed Single Circuit Loop In/Out
and Termination of 132kV
Transmission Line Into OMU 132kV
Simpang Ampat Switching Station | TNB | 2,434,787.00 | 07/09/2011 | 22/07/2013 |
20 | TNB (T)
2/2012 | Proposed Double Circuit
Underground Cable from PMU
Chembong KTMB Rembau 132kV
Feeder Station, Negeri Sembilan | TNB | 3,989,425.00 | 09/03/2012 | 30/04/2013 |
Item | Contract No. | Description of Contract | Owner | Contract Value (RM) | Date of Award | Date of Completion |
---|---|---|---|---|---|---|
Total | 67,660,996.00 | |||||
1 | TNB 2576/2017 | Proposed Termination of
Transmission Lines 230kV Plentong – Senibong and 275kV Permas Jaya – Plentong at PMU Plentong | TNB | 1,750,000.00 | 10/10/2017 | 07/03/2018 |
2 | TNB (T)
573/2019 | Proposed 275kV Single Circuit Loop
In/ Out Into Alliance Steel Plant – Interim From Teluk Kalong – Gebeng Industrial Transmission Line | TNB | 4,600,000.00 | 20/01/2017 | 01/12/2017 |
3 | TNB
251/2015 | Proposed 132Kv Double Circuit Transmission Lines Looping In/Out Into 132/33Kv Senai Hi-Tech East Substation From Existing 132Kv KTBR-SELG/BBTU Transmission Line | TNB | 19,480,370.00 | 22/10/2015 | 29/08/2017 |
4 | TNB (T)
1530/2017 | Reconfiguration Of 275Kv Overhead Lines at PMU Port Klang Power Station for Asset Maintenance (Selangor) asset Maintenance Department, Transmission TNB | TNB | 1,700,000.00 | 10/04/2017 | 19/06/2017 |
5 | TNB (B)
877/2012
P | Installation, testing & Commission of 33KV Aluminium XLPE single core UG Cable UG Fibre Optic Cable & Accessories from PMU Strand Mall LILO PMU Kota Damansara/PPUM Dataran Sunway for TNB Distribution | TNB | 1,178,436.00 | 07/11/2013 | 09/06/2016 |
6 | TNB (T)
500/2015 | Upgrading 132Kv Transmission Lines From PMU Papan To PMU Pengkalan | TNB | 3,360,000.00 | 04/01/2016 | 16/08/2016 |
7 | TNB (T)
557/2014 | Proposed Double Circuit 275Kv Transmission Line From 275/132Kv Prai GIS to PMU Kuala Ketil | TNB | 2,485,000.00 | 24/01/2015 | 15/01/2016 |
8 | TNB (T)
566/2014 | Double Circuit Loop In/Out From 132Kv Overhead Line Skudai -Stulang Into PMU South Key, Johor Bahru | TNB | 899,888.00 | 08/02/2015 | 29/03/2016 |
9 | TNB (T)
370/2015 | Kerja-kerja Merekabentuk Dan
Membina Menara Penghantaran 275Kv T74 dan T75 Talian Atas dari PMU Kampung Awah ke PNU Yong Peng East bagi Jabatan Pengurus Negeri (Pahang) Jabatan Senggaraan Aset, Bahagian Penghantaran, TNB | TNB | 948,195.00 | 01/10/2015 | 21/02/2016 |
10 | TNB (D)
526/2015
(N) | Merekabentuk, Membina dan Menyiapkan Menara Talian 33Kv No. KL-B 1 & KL-B 142, Kuala Lipis – Beletik, Pahang | TNB | 1,360,000.00 | 12/10/2015 | 12/10/2016 |
11 | TNB (T)
567/2014 | Installation of Two(2) 132Kv Lattice Towers Type T to Replace the Permanent backstay at existing 132Kv Overhead Line From Tebrau- Ulu Tiram, Kota Tinggi, Johor | TNB | 612,890.00 | 11/03/2015 | 02/08/2016 |
12 | TNB (T)
91/2014 | Proposed 132Kv Double Circuit Loop
In/ Out Pekan Industry from Pekan Tanjung Batu Transmission Line & Double Circuit 132Kv Transmission Line From Kuantan Point A to PMU Pekan Industry | TNB | 3,462,652.00 | 29/04/2014 | 21/12/2015 |
13 | TNB (T)
555/2014 | Construction of New Transmission
Line Works at PMU 132/33Kv Bukit Tengah (REHAB STAGE 2) | TNB | 2,125,000.00 | 20/01/2015 | 17/09/2015 |
14 | TNB (T)
474/2014 | Merekabentuk Dan Membina Menara Penghantaran 132Kv T33 Hingga T42 Talian Atas Tanjong Gelang – Pahang Cement & Tanjung Gelang – Semambu Dan 275Kv T32 Hingga T35 Talian Atas Kuantan North- Gebeng Industri Bagi Pejabat Pengurusan Negeri (Pahang), Jabatan Senggaraan Aset, Bahagian Penghantaran TNB | TNB | 6,322,000.00 | 23/10/2014 | 24/03/2015 |
15 | TNB (T)
454/2012 | 132Kv Transmission Line Single Circuit
Loop In/Out from 132Kv Paka-Rantau Petronas into Cheil Jedang Switching Station | TNB | 2,975,879.00 | 01/10/2013 | 27/07/2015 |
16 | TNB (T)
275/2012 | Proposed Double Circuit
Underground Cable from PMU Tasek Gelugor Switching Station to KTMB Tasek Gelugor 132kV Feeder Station | TNB | 1,977,480.00 | 12/10/2012 | 19/05/2014 |
17 | TNB (T)
294/2012 | Proposed 132kV Bulk Supply to
Petronas Cogan GPP Complex A (132kV Double Circuit Underground Cable From Kertih Industrial Substation to GPP GIS Substation) | TNB | 2,906,024.00 | 15/10/2012 | 12/08/2013 |
18 | TNB (T)
3/2012 | Proposed 132kV Single Circuit Underground Cable from PMU Pandamaran to KTMB Feeder Station Jalan Kastam, Port Klang | TNB | 3,092,970.00 | 20/02/2012 | 29/08/2013 |
19 | TNB (T)
262/2011 | Proposed Single Circuit Loop In/Out
and Termination of 132kV Transmission Line Into OMU 132kV Simpang Ampat Switching Station | TNB | 2,434,787.00 | 07/09/2011 | 22/07/2013 |
20 | TNB (T)
2/2012 | Proposed Double Circuit
Underground Cable from PMU Chembong KTMB Rembau 132kV Feeder Station, Negeri Sembilan | TNB | 3,989,425.00 | 09/03/2012 | 30/04/2013 |
Completed Projects Year 2018 - 2013
List of Major Project Completed
Item | Contract No. | Description of Contract | Owner | Contract Value (RM) | Date of Award | Date of Completion |
---|---|---|---|---|---|---|
Total | 5,782,011.20 | |||||
1 | TNB (T)
198/2012 | Proposed Replacement of 132kV XLPE
Underground Cable (Transformer
Tail) for SGT 1 at Kg. Awah | TNB | 415,950.00 | 29/06/2012 | 19/10/2012 |
2 | LB/IPC/
L416/2012 | Proposed “Design and Build/Turnkey”
for Relocation Works on TNB Towers
and Transmission Lines at Lot 37889,
Lebuh Raya Puchong – Sg. Besi,
Mukim Petaling Daerah Kuala
Lumpur, Wilayah Persekutuan For
Wealth Plateau Sdn Bhd | Wealth
Plateau
Sdn Bhd | 688,000.00 | 20/04/2012 | 23/07/2012 |
3 | ISB/BGI/
PBCSB/
BE2011/05 | Proposed Sungai Buaya Interchange
and Toll Plaza-Relocation Works for
TNB Pylons And Transmission Line | PLUS | 730,000.00 | 08/09/2011 | 12/04/2012 |
4 | PO:
20464144 | Kerja-Kerja Membaikpulih Kerosakan
Kabel 132kV SHAB-SHAW Litar 1&2 | TNB | 442,000.00 | 19/09/2011 | 05/11/2011 |
5 | TNB (T)
79/2011 | Proposed Single Circuit Transmission
Line Into 132kV Taman Intan
Substation | TNB | 499,910.00 | 03/08/2011 | 08/12/2011 |
6 | TNB (T)
156/2010 | Cadangan Kerja-Kerja
Merekabentuk, Membina &
Merdirisiapkan 2 Buah Menara Jenis
23S Pada Talian 132kV Ulu Tiram –
Kota Tinggi | TNB | 478,725.00 | 05/05/2010 | 15/07/2010 |
7 | TNB (T)
174/2010 | Cadangan Kerja-Kerja
Merekabentuk, Membina &
Mendirisiapkan Sebuah Menara Jenis
23S No. 30 Talian 132kV KLIA-BCGH
Menggantikan Menara No 30
Sediada | TNB | 317,520.00 | 27/05/2010 | 03/07/2010 |
8 | TNB (T)
516/2009 | Proposed Reinforcement of 132kV
Transmission Line Alor Setar (Single
Circuit T-Off Into PMU Alor Setar from
132kV Transmission Line Tanjung
Pauh-Mergong) | TNB | 655,280.00 | 07/12/2009 | 28/10/2010 |
9 | TNBT/
SMPP/
PRONLINT
AS/2009/
PBCSB | Package 3- The proposed
construction and Completion Part of
Project Lebuhraya Kemuning-Shah
Alam (LKSA) Highway Stretch from
section at Jalan 24/13 Shah Alam to
Interchange at Federal highway
Route 2 in Shah Alam- The design,
Execution and completion of
Transmission Tower Relocation
Works | Project
Lintasan
Shah
Alam
Sdn Bhd | 554,626.20 | 31/10/2008 | 22/04/2009 |
10 | IS/PH/
PBCSB/
SOLU/0007-
2007 | Purposed Design, Build, Testing
Commissioning and Maintenance of
Putra Height Interchange and Toll
Plaza at Km 13.2 North South Central
Link Expressway- Relocation Works
for TNB Pylons and Transmission Line | PKNS
Infra
Berhad | 1,000,000.00 | 11/05/2007 | 23/11/2007 |
Item | Contract No. | Description of Contract | Owner | Contract Value (RM) | Date of Award | Date of Completion |
---|---|---|---|---|---|---|
Total | 5,782,011.20 | |||||
1 | TNB (T)
198/2012 | Proposed Replacement of 132kV XLPE Underground Cable (Transformer Tail) for SGT 1 at Kg. Awah | TNB | 415,950.00 | 29/06/2012 | 19/10/2012 |
2 | LB/IPC/
L416/2012 | Proposed “Design and Build/Turnkey” for Relocation Works on TNB Towers and Transmission Lines at Lot 37889, Lebuh Raya Puchong – Sg. Besi, Mukim Petaling Daerah Kuala Lumpur, Wilayah Persekutuan For Wealth Plateau Sdn Bhd | Wealth
Plateau Sdn Bhd | 688,000.00 | 20/04/2012 | 23/07/2012 |
3 | ISB/BGI/
PBCSB / BE2011/05 | Proposed Sungai Buaya Interchange and Toll Plaza-Relocation Works for TNB Pylons And Transmission Line | PLUS | 730,000.00 | 08/09/2011 | 12/04/2012 |
4 | PO:
20464144 | Kerja-Kerja Membaikpulih Kerosakan Kabel 132kV SHAB-SHAW Litar 1&2 | TNB | 442,000.00 | 19/09/2011 | 05/11/2011 |
5 | TNB (T)
79/2011 | Proposed Single Circuit Transmission Line Into 132kV Taman Intan Substation | TNB | 499,910.00 | 03/08/2011 | 08/12/2011 |
6 | TNB (T)
156/2010 | Cadangan Kerja-Kerja Merekabentuk, Membina & Merdirisiapkan 2 Buah Menara Jenis 23S Pada Talian 132kV Ulu Tiram – Kota Tinggi | TNB | 478,725.00 | 05/05/2010 | 15/07/2010 |
7 | TNB (T)
174/2010 | Cadangan Kerja-Kerja
Merekabentuk, Membina & Mendirisiapkan Sebuah Menara Jenis 23S No. 30 Talian 132kV KLIA-BCGH Menggantikan Menara No 30 Sediada | TNB | 317,520.00 | 27/05/2010 | 03/07/2010 |
8 | TNB (T)
516/2009 | Proposed Reinforcement of 132kV Transmission Line Alor Setar (Single Circuit T-Off Into PMU Alor Setar from 132kV Transmission Line Tanjung Pauh-Mergong) | TNB | 655,280.00 | 07/12/2009 | 28/10/2010 |
9 | TNBT/
SMPP / PRONLINT AS/2009 / PBCSB | Package 3- The proposed
construction and Completion Part of Project Lebuhraya Kemuning-Shah Alam (LKSA) Highway Stretch from section at Jalan 24/13 Shah Alam to Interchange at Federal highway Route 2 in Shah Alam- The design, Execution and completion of Transmission Tower Relocation Works | Project
Lintasan Shah Alam Sdn Bhd | 554,626.20 | 31/10/2008 | 22/04/2009 |
10 | IS/PH/
PBCSB / SOLU/0007- 2007 | Purposed Design, Build, Testing Commissioning and Maintenance of Putra Height Interchange and Toll Plaza at Km 13.2 North South Central Link Expressway- Relocation Works for TNB Pylons and Transmission Line | PKNS
Infra
Berhad | 1,000,000.00 | 11/05/2007 | 23/11/2007 |
Completed Projects Year 2012 - 2007
List of Major Project Completed
Item | Contract No. | Value (RM) |
---|---|---|
Total | 250,200,000.00 | |
1 | TNB 680/2022 Upgrading OHL 132kV KLUANG-NYIOR /KLUANG INDUSTRY | 25,130,000.00 |
2 | TNB 948/2022 132kV OHL From TANJUNG PAUH To PMU 132/33kV KEDAH RUBBER CITY (MAINHEAD 2 AP22A To KUALA NERANG) | 35,760,000.00 |
3 | TNB 949/2022 132kV OHL From PMU TANJUNG PAUH To PMU 132/33kV KEDAH RUBBER CITY (MAINHEAD 3: KUALA NERANG To PMU KERC) | 29,860,000.00 |
4 | TNB 1640/2022 OHL 275kV DC AYER TAWAR (ATWR) – SERI ISKANDAR WEST (SIKW) | 61,000,000.00 |
5 | TNB 2344/2023 OHL 275kV DC SERI ISKANDAR WEST (SIKW) – KG GAJAH (KGJH) (TO ENERGIZE 132kV) | 55,500,000.00 |
6 | TNB 1154/2024 PROPOSED 132KV BULK SUPPLY TO EVE ENERGY MALAYSIA SDN. BHD. IN PADANG MEHA, KULIM, KEDAH DARUL AMAN (INTERIM SUPPLY) | 42,950,000.00 |
Item | Contract No. | Value (RM) |
---|---|---|
Total | 250,200,000.00 | |
1 | TNB 680/2022 Upgrading OHL 132kV KLUANG-NYIOR /KLUANG INDUSTRY | 25,130,000.00 |
2 | TNB 948/2022 132kV OHL From TANJUNG PAUH To PMU 132/33kV KEDAH RUBBER CITY (MAINHEAD 2 AP22A To KUALA NERANG) | 35,760,000.00 |
3 | TNB 949/2022 132kV OHL From PMU TANJUNG PAUH To PMU 132/33kV KEDAH RUBBER CITY (MAINHEAD 3: KUALA NERANG To PMU KERC) | 29,860,000.00 |
4 | TNB 1640/2022 OHL 275kV DC AYER TAWAR (ATWR) – SERI ISKANDAR WEST (SIKW) | 61,000,000.00 |
5 | TNB 2344/2023 OHL 275kV DC SERI ISKANDAR WEST (SIKW) – KG GAJAH (KGJH) (TO ENERGIZE 132kV) | 55,500,000.00 |
6 | TNB 1154/2024 PROPOSED 132KV BULK SUPPLY TO EVE ENERGY MALAYSIA SDN. BHD. IN PADANG MEHA, KULIM, KEDAH DARUL AMAN (INTERIM SUPPLY) | 42,950,000.00 |
Projects Portfolio
Scale and Scope of Projects Undertaken
Item | Description | Machinery | Stringing Equipment |
---|---|---|---|
Total | 18 | 2 | |
1 | Crane 25 Tonne | 1 | |
2 | Backhoe | 3 | |
3 | Excavator | 8 | |
4 | Low Loader
Piling Mach | 1 | |
5 | Piling Machine | 2 | |
6 | Soil Investigation Machine | 3 | |
6 | Stringing Equipment Engine Puller – 2 Units Tensioner – 4 Units Automatic Compressor -9 Units Handle Winch (BV Winch) -20 Units Running Block – 580 Units Pilot Wire -8 Drum | 2 |
Item | Description | Machinery | Stringing Equipment |
---|---|---|---|
Total | 18 | 2 | |
1 | Crane 25 Tonne | 1 | |
2 | Backhoe | 3 | |
3 | Excavator | 8 | |
4 | Low Loader
Piling Mach | 1 | |
5 | Piling Machine | 2 | |
6 | Soil Investigation Machine | 3 | |
6 | Stringing Equipment Engine Puller – 2 Units Tensioner – 4 Units Automatic Compressor -9 Units Handle Winch (BV Winch) -20 Units Running Block – 580 Units Pilot Wire -8 Drum | 2 |